The garage floor has been poured and is being smoothed over.

The [outdoor] rock retaining wall is new too. One will be built on both ends.





Avatar

Gold is $1,581/oz today. When it hits $2,000, it will be up 26.5%. Let's see how long that takes. - De 3/11/2013 - ANSWER: 7 Years, 5 Months


- - - - -
View Replies (1) »



» You can also:
- - - - -
The above is a reply to the following message:
Re: Barn Update
By: Decomposed
in POPE 5
Thu, 26 Sep 19 5:01 AM
Msg. 40746 of 62138

The barn's septic system is in! I had to write a big check to the excavation guy. Not all of it was for the septic, but most of it was....

The leach field is doing double-doody, so to speak. Propeller The house will use the same field but will have its own septic tank well uphill from this one.

I was told that the rest of the barn's concrete floor is being poured tomorrow!

Scroll down for photos.