Re: My Septic System design has been approved... 

By: Decomposed in POPE 5 | Recommend this post (2)
Tue, 16 Apr 19 10:13 PM | 48 view(s)
Boardmark this board | Pope 5
Msg. 30378 of 62138
(This msg. is a reply to 30375 by micro)

Jump:
Jump to board:
Jump to msg. #

micro:

Re: "That is an interesting design for sure. Glad you got it approved. "
Thanks!

I didn't want to have to go through this twice. The house and barn will have their own septic tanks, but they'll share the leach field (which, as you noted, is at the bottom of the diagram.) That decreases the cost a bit and keeps me from having to design and request permitting for two systems.

I don't know if you read the whole plan, but the permit is good for four years. So that will be my target for getting the house built!




Avatar

Gold is $1,581/oz today. When it hits $2,000, it will be up 26.5%. Let's see how long that takes. - De 3/11/2013 - ANSWER: 7 Years, 5 Months


- - - - -
View Replies (1) »



» You can also:
- - - - -
The above is a reply to the following message:
Re: My Septic System design has been approved...
By: micro
in POPE 5
Tue, 16 Apr 19 9:41 PM
Msg. 30375 of 62138

De
I assume the leach field is atthe bottom of the page center?

That is an interesting design for sure. Glad you got it approved.