Replies to Msg. #955232
.
 Msg. #  Subject Posted by    Board    Date   
01840 Re: NH Project
   [color=green][b][i]micro,[/i][/b][/color] re: [b]"The roof must be...
Decomposed   POPE IV   01 Jan 2016
4:21 AM
01831 Re: NH Project
   micro I got mz ribit a ladder and a rake so I don't have to worry abo...
ribit   POPE IV   31 Dec 2015
10:10 PM

The above list shows replies to the following message:

Re: NH Project

By: micro in POPE IV
Thu, 31 Dec 15 7:50 PM
Msg. 01829 of 47202
(This msg. is a reply to 01807 by Decomposed)
Jump to msg. #  

De

that door is called a walk in door and commonly are referred to as a 3 x 7h .

Question: are you going to be selling anything
at the drive thru???? lol!!!

Good plans. And yes, the weight of snow is more evenly distributed on a roof that has a centered ridgeline and a "gabled" look. The pitch of the roof will matter as well and someone at the building place should have the specs of the requirements for the weight of snow higher than that accumulation on the roof, known as snow load. The roof must be rated higher than the snow load.

micro...