« ALEA Home | Email msg. | Reply to msg. | Post new | Board info. Previous | Home | Next

Wave timeline

By: Cactus Flower in ALEA | Recommend this post (0)
Fri, 22 Feb 13 7:23 PM | 102 view(s)
Boardmark this board | The Trust Matrix
Msg. 12682 of 54959
Jump:
Jump to board:
Jump to msg. #

For myself, I think things may begin in a big way once there's a really large installed base of trusted enterprise smart phones and tablets.

i'm a-waiting for silicon in fruit.

the thing that sustains wave investors' interest is the sense of imminence. the one continuous claim: next quarter.

when was this ever absent?

the one continuous reality is that tc is a long run project requiring the adoption of the architecture on a grand scale by equipment manufacturers.

at least three years to go.

yawn.




» You can also:
« ALEA Home | Email msg. | Reply to msg. | Post new | Board info. Previous | Home | Next